Laboratory Test Specifications

Construction Water Testing

pH level, organic impurities, inorganic solids, sulfates, chlorides, and neutralizing alkalinity tests.

Governing Testing Standards:IS 456 (Clause 5.4)IS 3025BS 3148

Service Overview & Scope

Testing water suitability for concrete mixing and curing to prevent delayed setting, strength loss, and steel rebar corrosion.

Engineering Purpose

To verify that water used at batching plants and field sites meets chemical safety limits.

Key Civil Engineering Applications

Concrete Batching Plant Water Verification
Curing Water Suitability Audits
Borewell Water Chemical Assessment for Construction
Pre-stressed Concrete Water Quality Screening

Testing Methodology & Field Execution

1

Determination of pH value using calibrated electronic pH meter.

2

Gravimetric analysis of Total Suspended Solids (TSS) and Total Dissolved Solids (TDS).

3

Titration determination of Chlorides (Cl-) and Sulfates (SO3).

4

Neutralization tests for organic and inorganic impurities.

Laboratory & Field Equipment

Precision Digital pH & Conductivity Meter
Analytical Electronic Balance (0.1mg accuracy)
Muffle Furnace & Drying Oven
Titration Setup & Reagents

Engineering Significance

Protects concrete from strength drop, efflorescence, and premature internal rebar corrosion.

Deliverable Reports & Certificates

  • Water Chemical Suitability Certificate
  • Chloride & Sulfate Limit Assessment Report
  • Concrete Mixing Clearance Document